Day Two - Driveway

To recap today.  This pile of rock was broken up and removed from basement area.

The driveway was extended on up to the homesite.

Gravel was dumped in the hole in preparation for the footings.  

The concrete guys plan to start on the footings tomorrow morning at 6:00 A.M.

2 comments:

  1. Is the object covered w/ blue tarp the well?

    ReplyDelete
  2. No that is the generator we use to run the well. It will be moved to the barn and stored as soon as we get electricity. If you look on down to the first photo under "Driveway" you will see a silver colored cylinder to the left of the generator. That is the well. It's a little less than three feet tall and 1 foot in diameter.