These guys were on the job at 6:00 A.M. getting the forms in place for the footings. Chris, the foundation guy, not to be confused with Chris, the dozer guy, had already called in an inspection appointment for Monday. He hopes to get the footings poured on Monday after the inspection.
Saturday, June 6, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment